Scope of CSI 09 77 53
CSI MasterFormat Section 09 77 53 covers vegetated wall assemblies — living wall systems where plants grow vertically in media attached to interior or exterior building surfaces. This section encompasses the structural support framework, waterproofing assembly, growing media, plant materials, irrigation system, supplemental lighting, and controls.
Coordination is required with Division 07 (waterproofing), Division 12 (if combined with freestanding plantscaping), Division 22 (irrigation supply and drainage), Division 23 (HVAC for humidity management), and Division 26 (electrical for grow lighting and controls).
Part 1 — General
1.01 System types
Specify one of the following system types based on project requirements:
| System Type | Weight (Saturated) | Cost Range | Replacement Rate |
|---|---|---|---|
| Felt-based | 8–10 PSF | Obtain installed quote | 10–15%/year |
| Modular panel | 10–15 PSF | Obtain installed quote | 5–10%/year |
| Hydroponic tray | 10–12 PSF | Obtain installed quote | 5–8%/year |
1.02 Submittals
Check the living-wall budget and bid-scope ledger when assigning work between trades. Confirm whether panels, labor, waterproofing, plumbing, lighting, controls and access are included before adding infrastructure allowances.
- System shop drawings: Panel layout, structural support details, irrigation schematic, lighting plan, waterproofing assembly section detail.
- Structural calculations: Saturated dead load, anchor point spacing, seismic restraint (where required). Sealed by licensed structural engineer.
- Waterproofing details: Membrane specification, drainage mat, gutter detail, leak detection sensor locations.
- Plant schedule: Species by botanical name, planting density (plants per SF), light requirement classification.
- Irrigation design: Pump sizing, distribution layout, timer programming, nutrient injection rates, emergency shutoff locations.
- Maintenance program: Service frequency, scope per visit, replacement protocol, emergency response procedures.
Part 2 — Products
2.01 Structural support
- Extruded aluminum or galvanized steel rail system as specified by manufacturer
- Minimum 1" stand-off from waterproofed wall surface to allow drainage and air circulation
- Anchor spacing per manufacturer's requirements and structural engineer's review
- All fasteners stainless steel or hot-dip galvanized
2.02 Waterproofing assembly
Required Assembly (Interior-to-Exterior):
- Structural wall substrate
- Fluid-applied waterproof membrane (min. 40 mil DFT) or self-adhered sheet membrane
- Drainage mat with filter fabric (min. 3/8" dimple height)
- Structural support rail system (min. 1" stand-off)
- Living wall panel/module system
Base Detail:
- Stainless steel drip edge at base of assembly
- Collection gutter (min. 4" width) with floor drain connection
- Moisture sensors at base, mid-height, and top (BMS-connected)
2.03 Irrigation system
- Closed-loop recirculating system with reservoir, pump, and distribution tubing
- Redundant pump with automatic failover
- Programmable timer with moisture sensor override
- Nutrient injection system with EC/pH monitoring
- Emergency shutoff valve accessible without scaffolding
- Overflow drain connected to building waste system
- Water treatment (UV sterilization or chlorine dosing) to prevent biofilm
2.04 Supplemental lighting
Agree project-specific plant targets and the living-wall lighting acceptance test before tender; the generic illuminance and color-temperature examples below do not establish plant suitability.
- LED grow lights: full spectrum, 5000–6500K color temperature
- Minimum 150 FC at plant canopy (300 FC for medium-light species)
- Photoperiod: 12–16 hours per day via programmable timer
- Mounting: track-mounted or recessed to minimize visual impact
- Dimming capability for occupied-space comfort
Part 3 — Execution
3.01 Pre-installation testing
- 72-hour flood test of waterproofing assembly before structural support installation
- Verify irrigation supply pressure and flow rate at point of connection
- Confirm electrical circuits for lighting and controls are energized and tested
- Document ambient light levels at wall surface for species selection verification
3.02 Commissioning
- Irrigation: Run full cycle, verify uniform distribution across all zones, check for leaks at every connection
- Drainage: Confirm collection gutter captures all runoff, floor drain flows freely
- Lighting: Verify FC readings at plant canopy match specification, program timers
- Leak detection: Test all moisture sensors, verify BMS alarm routing
- Documentation: Complete as-built drawings, photograph all concealed conditions before planting
3.03 Warranty and maintenance
- System warranty: Minimum 2 years on structural support, waterproofing, and irrigation components
- Plant warranty: Minimum 90 days from substantial completion. Replace dead or declining plants within 14 business days.
- Maintenance: Weekly service visits for first 6 months; biweekly thereafter. Include watering adjustments, pruning, fertilization, pest monitoring, and plant replacements.